Planning a renovation in Malaysia? Get accurate 2025 renovation costs by room (living room, kitchen, bathroom) and by trade (tiling, painting, electrical). Includes KL, Selangor, Penang, and Johor pricing.
Renovation costs in Malaysia vary widely depending on the scope of work, quality of materials, and your location. This guide breaks down realistic 2025 renovation costs so you can budget accurately β and avoid overpaying.
Pro tip: Always upload your renovation quotation to RenoSmart's AI Audit tool. It automatically checks if the prices are fair, flags missing items, and identifies potential overcharges β for free.
Average Renovation Cost by Property Type
| Property Type | Basic (RM) | Mid-Range (RM) | High-End (RM) |
|---|---|---|---|
| Condo (800β1,000 sqft) | 30,000β50,000 | 60,000β100,000 | 120,000+ |
| Terrace House (1,500 sqft) | 50,000β80,000 | 100,000β160,000 | 200,000+ |
| Semi-D (2,000 sqft) | 80,000β120,000 | 150,000β250,000 | 300,000+ |
| HDB (Singapore, 900 sqft) | SGD 30,000β50,000 | SGD 60,000β100,000 | SGD 120,000+ |
Renovation Cost by Room (Malaysia 2025)
Living & Dining Room
| Item | Unit | Price Range (RM) |
|---|---|---|
| Feature wall (plaster/timber) | per wall | 1,500β5,000 |
| Ceiling works (false ceiling) | per sqft | 15β35 |
| Flooring (tiles 60Γ60) | per sqft | 8β18 |
| Flooring (vinyl plank) | per sqft | 6β14 |
| Painting (2 coats) | per sqft | 1.50β3.00 |
| TV console (custom carpentry) | per unit | 3,000β8,000 |
| Curtain track + installation | per window | 300β800 |
Kitchen Renovation Cost
| Item | Unit | Price Range (RM) |
|---|---|---|
| Kitchen cabinet (full set) | per lineal ft | 350β800 |
| Quartz countertop | per sqft | 80β200 |
| Wall tiles (field) | per sqft | 5β15 |
| Floor tiles (heavy duty) | per sqft | 8β20 |
| Plumbing (sink, pipes) | lump sum | 1,500β4,000 |
| Kitchen hood & hob | per set | 1,500β5,000 |
| Backsplash (mosaic/subway) | per sqft | 15β40 |
Bathroom Renovation Cost
| Item | Unit | Price Range (RM) |
|---|---|---|
| Full bathroom hacking & rebuild | per bathroom | 8,000β20,000 |
| Wall tiles (full height) | per sqft | 6β18 |
| Floor tiles (anti-slip) | per sqft | 7β15 |
| Waterproofing (critical!) | per sqft | 8β20 |
| Shower screen | per unit | 800β3,500 |
| Vanity cabinet | per unit | 800β3,000 |
| Toilet bowl | per unit | 400β2,500 |
| Water heater installation | per unit | 300β800 |
β οΈ Waterproofing is the #1 item contractors skip to cut costs. If your quotation doesn't list waterproofing for bathrooms separately, demand it be added. A missing waterproofing job can lead to RM30,000+ in damage claims.
Renovation Cost by Trade
| Trade | Unit | Market Rate (RM) |
|---|---|---|
| Tiling (supply & install) | per sqft | 8β20 |
| Carpentry (custom) | per sqft | 150β400 |
| Painting (walls, 2 coats) | per sqft | 1.50β3.00 |
| Electrical (first point) | per point | 120β200 |
| Electrical (additional point) | per point | 80β150 |
| Plumbing (new point) | per point | 200β400 |
| False ceiling (gypsum) | per sqft | 15β30 |
| Masonry / Brickwork | per sqft | 30β80 |
| Glass & Aluminium works | per sqft | 80β200 |
| Air-con (supply & install, 1HP) | per unit | 1,200β2,500 |
Price Differences by State
| State | Cost Index | Notes |
|---|---|---|
| Kuala Lumpur | 100% (baseline) | Highest labour costs |
| Selangor (PJ, SS, Ara Damansara) | 95β100% | Similar to KL |
| Penang (Georgetown area) | 90β95% | Slightly lower |
| Johor Bahru | 80β90% | More competitive |
| Other states | 70β85% | Generally 15β30% cheaper |
| Singapore | 250β350% | SGD pricing, much higher |
How to Keep Renovation Costs Under Control
- 1Get at least 3 quotations β prices for the same job can vary 40β60% between contractors
- 2Ask for itemised breakdowns β never accept lump sum quotes without line items
- 3Audit your quotation with AI β tools like RenoSmart flag overpriced items instantly
- 4Fix your budget before meeting contractors β tell them your max budget upfront
- 5Don't skip waterproofing β it's cheap now, catastrophically expensive to fix later
- 6Negotiate payment terms β never pay more than 30% upfront
- 7Get everything in writing β verbal promises mean nothing in disputes
Frequently Asked Questions
How long does a full renovation take in Malaysia?
A full condo renovation (800β1,000 sqft) typically takes 6β10 weeks. Landed property renovations take 10β16 weeks. Major factors affecting timeline: custom carpentry lead time (3β4 weeks), tile delivery, and contractor scheduling.
Is it cheaper to renovate or buy a new property?
In most cases, renovating is significantly cheaper. A full gut renovation of a 1,000 sqft condo costs RM60,000β120,000 vs. the RM200,000β500,000 price difference between a sub-sale unit and new launch in the same area.
What is NOT included in most renovation quotations?
- Furniture (beds, sofas, dining table) β usually separate
- Appliances (fridge, washing machine, oven) β usually separate
- Curtains and blinds β sometimes excluded
- Light fixtures β bulbs often excluded even if wiring included
- Rubbish disposal β check if included
- Touch-up works after moving in β usually a separate cost
π‘ Use RenoSmart's free AI Quotation Audit to instantly check if your renovation quote is fair. Upload your PDF or Excel file and get a detailed analysis in under 30 seconds β including which items are overpriced, what's missing, and the estimated fair price.